Tsing Yi Industrial Centre Phase 2 Block C
青衣工業中心二期座
Block C, Phase II, Tsing Yi Industrial Centre, 1-33 Cheung Cheung Road, Tsing Yi, New Territories

Building Info
“Tsing Yi Industrial Centre Phase 2 Block C is located at Tsing Yi, completed in 1988.”
The industrial building rises 18 storeys above ground. Tsing Yi Industrial Centre Phase 2 Block C offers versatile industrial floor space suitable for a wide range of light manufacturing, logistics, and storage operations. The building is well-served by nearby transport infrastructure, providing efficient access for goods vehicles and commercial freight movements. It presents a practical and cost-effective solution for businesses requiring industrial premises in one of Hong Kong's established commercial and logistics corridors. Located within a major industrial zone, Tsing Yi Industrial Centre Phase 2 Block C benefits from proximity to key transport links, container terminals, and logistics networks. The building is designed to accommodate the operational needs of light industrial, trade, and storage tenants, offering flexible floor plans and practical loading facilities.
Type
Industrial Building
District
Tsing Yi
Built
1988
Grade
—
Floors
18 floors
Floor plate
—
Total GFA
—
Ownership
—
Air-con
—
Elevators
—
Parking
—
Nearby parking
—
Address
Block C, Phase II, Tsing Yi Industrial Centre, 1-33 Cheung Cheung Road, Tsing Yi, New Territories
Ref.
B0001607
Available Listings (0)
No Available Listings
Nearby Buildings
No results
FAQ
Where is it? Nearest MTR?
Located in Tsing Yi, Hong Kong. Contact our advisor for transport details.
Professional Advisory · 1 Hour Response
Query Available Floors at Tsing Yi Industrial Centre Phase 2 Block C
Senior consultant provides all available units, floor comparison, and landlord negotiation support.
