Tsing Yi Industrial Centre Phase 1 Block A
青衣工業中心一期座
Block A, Phase 1, Tsing Yi Industrial Centre, 1-33 Cheung Cheung Road, Tsing Yi, New Territories

Building Info
“Tsing Yi Industrial Centre Phase 1 Block A is located at Tsing Yi, completed in 1985.”
The industrial building rises 15 storeys above ground. The property is held under strata title. Parking facilities include 1 container truck, 101 goods vehicle and 70 private car parking space(s). The building is served by 2 lifts. Tsing Yi Industrial Centre Phase 1 Block A offers versatile industrial floor space suitable for a wide range of light manufacturing, logistics, and storage operations. The building is well-served by nearby transport infrastructure, providing efficient access for goods vehicles and commercial freight movements. It presents a practical and cost-effective solution for businesses requiring industrial premises in one of Hong Kong's established commercial and logistics corridors. Located within a major industrial zone, Tsing Yi Industrial Centre Phase 1 Block A benefits from proximity to key transport links, container terminals, and logistics networks.
Type
Industrial Building
District
Tsing Yi
Built
1985
Grade
—
Floors
15 floors
Floor plate
—
Total GFA
—
Ownership
分拆業權
Air-con
—
Elevators
2
Parking
貨櫃車1個車位、貨車101個車位、私家車70個車位
Nearby parking
—
Address
Block A, Phase 1, Tsing Yi Industrial Centre, 1-33 Cheung Cheung Road, Tsing Yi, New Territories
Ref.
B0001605
Available Listings (0)
No Available Listings
Nearby Buildings
No results
FAQ
Where is it? Nearest MTR?
Located in Tsing Yi, Hong Kong. Contact our advisor for transport details.
In-building parking?
貨櫃車1個車位、貨車101個車位、私家車70個車位
Ownership and developer?
Ownership: 分拆業權. For lease enquiries, contact Candice Choi (+852 6253 8886).
Professional Advisory · 1 Hour Response
Query Available Floors at Tsing Yi Industrial Centre Phase 1 Block A
Senior consultant provides all available units, floor comparison, and landlord negotiation support.
